SCH Number 2012121056


Project Info

Title
Pipeline 3 Relining - Sweetwater to Lower Otay Reservoir
Description
The proposed project consists of rehabilitation of ~28,400 linear feet of existing Prestressed Concrete Cylinder Pipe (PCCP) along the existing Water Authority Pipeline 3. The proposed project would rehabilitate Pipeline 3 through installation of a steel liner into the existing PCCP along one contiguous segment of the pipeline.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
San Diego County Water Authority Pipeline 3 Relining - Sweetwater to Lower Otay Reservoir
San Diego County Water Authority Pipeline 3 Relining - Sweetwater to Lower Otay Reservoir

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.