SCH Number 2012062035


Project Info

Title
Yountville Recycled Water Project
Description
The project is limited to: Installation of an 8-inch recycled water pipeline using open trench construction method in a 30-foot long, 2-foot wide, and 4-foot deep trench crossing an existing channel. A total of approximately 9 cubic yards of material will be temporarily removed and replaced as part of the Project. The 9 cubic yards of material includes the removal of 2-3 cubic yards of existing rip rap that will be replaced in kind after the installation of the pipeline. Approximately 150 square feet of existing non-native grasses will be removed and revegetated as part of the Project.