SCH Number 2012011031
Project Info
- Title
- Turner Basin Project
- Description
- The proposed project includes the expansion of the existing recharge basins and the construction and improvement of inlet facilities to increase the maximum operational water depth in the basins. The purpose of the proposed basin modifications is to increase the Inland Empire Utilities Agency's (IEUA or Agency) groundwater recharge capacity as part of the comprehensive effort to supplement local water supplies in the Chino Basin and to support the groundwater demands (potable water supply) of the population within the Agency's service area.
2 documents in project