SCH Number 2011121028
Project Info
- Title
- Cabot-Camino Capistrano Bridge Project
- Description
- The proposed project would consist of the construction of a roadway bridge structure that would connect Camino Capistrano to the intersection of Cabot Road and Merit Circle. Specifically, the bridge would: 1) begin at the northerly terminus of Camino Capistrano, where it transitions into an access road to the MNWD reclamation plant; 2) proceed north approximately 0.25-mile; 3) turn west to cross over the existing SCRRA/Metrolink/BNSF railroad alignment; and 4) connect to the intersection of Cabot Road and Merit Circle. The bridge structure would have one lane in each direction, with a separate left turn lane from westbound Camino Capistrano to southbound Cabot Road and a separate right turn lane from westbound Camino Capistrano to northbound Cabot Road. The proposed project would include signalization improvements at the proposed Camino Capistrano/Cabot Road/Merit Circle intersection. The proposed bridge would feature a total of four columns, all of which occur within the Camino Capistrano right-of-way (ROW). The total length of all proposed project facilities would be 1,800 linear feet, while the bridge would be 706 linear feet (measured along the proposed Camino Capistrano centerline).
2 documents in project