- Special Use Permit No. PSP 10-060/PSF
- Description
- Development of a biogas facility for extraction of methane gas, via an anaerobic manure digester, for use by Calgren Renewable Fuels (located adjacent to the subject site). The facility will be used to produce 266 MMBTUS per day of biogas via an anaerobic digestion of manure feedstock from nearby dairies. The biogas produced will be used to fuel the Calgren bio-refinery facility, located adjacent and to the south of the project site, which will reduce the Calgren plant consumption of natural gas.