SCH Number 2011032003
Project Info
- Title
- Auburn Ravine Gaging Station Fish Passage Improvement Project
- Description
- To install a "nature-like fishway" consisting of a series of rock chutes and armored step pools; stabilizing elements such as concrete-capped sheetpiles placed within a matrix of large rock, and other smaller materials mixed in throughout.
3 documents in project