SCH Number 2010111056
Project Info
- Title
- Le Conte Battery Energy Storage System Project
- Description
- Note: Review Per Lead The proposed Le Conte Battery Energy Storage Project (Project) is a battery energy storage system with up to 125 megawatts (MW) of electric storage capacity, located within the boundary of the existing Centinela Solar Energy (CSE) facility site. The Project is designed to operate and will be monitored 24 hours per day, 7 days per week and would not require any on site regular employees. The batteries, battery racks and related control systems will be housed internally within up to two buildings totaling 85,000 square feet. Inverters, an on- site substation and a 230-kilovolt (kV) overhead electric tie line will be located outdoors. Routine maintenance activities, including equipment testing, monitoring, and repair will occur as needed. Only authorized personnel will be permitted on-site and generally will be limited to the personnel monitoring and maintaining the facility. *See NOC for full details*
7 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
SIR | Imperial County | Le Conte Battery Energy Storage System Project | |
NOP | Imperial County | Le Conte Battery Energy Storage Project | |
NOD | Imperial County | Centinela Solar | |
NOD | Imperial County | Centinela Solar | |
FIN | Imperial County | Centinela Solar Energy Project | |
EIR | Imperial County | Centinela Solar Energy Project | |
NOP | Imperial County | Centinela Solar |