SCH Number 2010084002


Project Info

Title
San Clemente Shoreline Feasibility Study
Description
The study area is encompassed within the City of San Clemente and extends approximately 3,412 ft. (1,040m) from Linda Lane to T Street. The Proposed Projects consists of dredging material from offshore Oceanside, then hauling and placing it at San Clemente Beach. The proposed Project is a 50 foot (15m) resultant beach width. Beach fill would be 3,412 ft. (1,040 m) long with a +17 ft (+5.2 m) crest elevation. The dredge volume is estimated to be approximately 251,130 cubic yards (192,000 m3). Construction is anticipated to begin in 2012.
Download CSV New Search

 

7 documents in project

Type Lead/Public Agency Received Title
City of San Clemente City of San Clemente Coastal Storm Damage Reduction Project/San Clemente Shoreline Protection Project
City of San Clemente San Clemente Shoreline Project
City of San Clemente San Clemente Shoreline Project
City of San Clemente San Clemente Shoreline Coastal Storm Damage Reduction Project
City of San Clemente San Clemente Shoreline Coastal Storm Damage Reduction Project
United States Army, Army Corps of Engineers (USACE) San Clemente Shoreline Feasibility Study
United States Army, Army Corps of Engineers (USACE) San Clemente Shoreline Feasibility Study