SCH Number 2010082039
Project Info
- Title
- SRDC Recycling Facility
- Description
- NOTE: FINAL NOTE: Response to Comments NOTE: Review per Lead SRDC has operated a Construction Demolition (C&D) debris and green wood waste recycling facility at the project location since 2008 with a 673-ton/day maximum permitted throughput. SRDC is seeking a long-term large Volume Construction and Demolition/Inert C&D Debris Processing Facility Permit from the California Integrated Waste Management Board, and other necessary authorization to increase the maximum throughput to 1,200 tons/day. Primary recycling operations will be in a structure 50 to 55 feet tall consisting of concrete base sidings and canvas roof/wall enclosure. The facility will include recycling equipment, semi-enclosed bins, truck scales, and offices. Trucks will pick up and drop off materials for processing or delivery. Processed wood chips will be shipped by barge to biomass facilities within northern California, using the existing port facilities.
3 documents in project