SCH Number 2010061066


Project Info

Title
Haster Basin and Recreational Field Project
Description
The project consists of the construction of a pump station and modifications to the existing Basin to provide increased flood protection within the C05-East Garden grove Wintersburg watershed as well as increased recreational opportunities. The project includes the following elements: enhanced flood water storage; a new pump station at the southwest corner of the basin; downstream improvements to the East garden Grove Wintersburg Channel to increase capacity between the new pump station and Aspenwood Lane; filling of a portion of the Basin for a recreation area; construction of a triple-carrel concrete flood control box under the existing parking lot and fill area; reconfiguration and expansion of the existing 44 car parking lot to provide a total of approximately 80 parking spaces; construction of a driveway/construction access road off Haster Street, which will be converted to a permanent entrance/exit to the new parking lot at the end of construction; and landscaping and an irrigation system. Construction of the proposed project is expected to take approximately 18 months.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Orange County Flood Control District Haster Basin and Recreational Field Project
Orange County Flood Control District Haster Basin and Recreational Field Project