SCH Number 2010041077
Project Info
- Title
- Bolsa Chica Embankment Reconstruction Project
- Description
- This project proposes to complete the emergency project by installing pedestrian safety cable rails and metal beam guard rails to protect motorists, cyclists, and the pedestrian public. This project proposes to install ~495 ft of pedestrian safety cable railing adjacent to the wall and ~538 ft of metal beam guard rail (MBGR) or 500 ft of concrete barrier to increase traffic safety for the motoring, cycling, and pedestrian public. Prior to the installation of the pedestrian cable rail and the MBGR or concrete barrier, removal of existing temporary concrete barrier railing (type K) and its underlying asphalt concrete (AC) strip shall be completed.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
FIN | California Department of Transportation, District 12 | Bolsa Chica Embankment Reconstruction Project | |
NOD | California Department of Transportation, District 12 | Bolsa Chica Embankment Reconstruction Project | |
NEG | California Department of Transportation, District 12 | Bolsa Chica Embankment Reconstruction Project |