SCH Number 2010032092
Project Info
- Title
- Rock Creek Trail Development
- Description
- Eldorado National Forest proposes to install ~8.9 miles of new trail, 0.5 miles of trail reconstruction, 3 new bridges, and 3 new prefabricated restrooms (vault toilets) at the Rock Creek Trail System in the Georgetown Ranger District. The trail inventory and monitoring for the Rock Creek Trail System revealed that certain trail segments are in poor condition. Therefore, reroutes are proposed on 13 segments. Three new bridges are proposed at the lower Rock Creek crossing, and on Ballarat Trail. Two prefabricated vault toilets are proposed at the Mace Mill Staging Area, and one is proposed at the Bald Mount Staging Area.
2 documents in project