SCH Number 2010032034


Project Info

Title
North Pond Footbridge Project
Description
Installation of a pre-fabricated 115 x 6 ft fiberglass footbridge installed over the tidal channel that enters North Pond of the Pescadero Marsh near Highway #1. Replace/re-construct a 588 ft long, 36 inch wide recreational hiking trail. The trail will be constructed entirely by hand crews using hand tools. Construct a 18 ft x 12 ft public observation platform. Areas disturbed by construction will be re-vegetated with native plant materials from local genetic sources.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Parks and Recreation North Pond Footbridge Project
California Department of Parks and Recreation North Pond Footbridge Project