SCH Number 2009101105
Project Info
- Title
- Riverside North Aquifer Storage and Recovery Project
- Description
- The proposed project is separated into five components: in-stream recharge (inflatable dam, diversion structure, and conveyance pipeline), off-stream recharge (3 to 8 recharge basins, diversion for the Riverside Canal (conveyance facilities), State Water Project pipeline (valves and connection pipeline to Riverside Canal Pipeline), and utility crossing. The in-stream recharge component will require the modification of the streambed directly upstream of the proposed inflatable dam. The purpose of the proposed project is to recharge the groundwater aquifers in the Riverside and Colton Basins, improve groundwater quality of the Riverside and Colton basins, create drought storage, reduce dependence on imported water, maximize local groundwater production, maximize capture and use of local surface water, and provide seasonal storage.
3 documents in project