SCH Number 2009088239
Project Info
- Title
- Anaheim Public Utilities Pilot Storm Water Infiltration Project
- Description
- The Project will include constructing a pre-treatment system for stormwater runoff, installing an infiltration well downgradient of the pre-treatment system, installing groundwater monitoring wells up and downgradient of the infiltration system, and installing lysimeters to collect soil pore water below the infiltrations system.
2 documents in project