SCH Number 2009088125
Project Info
- Title
- Harbison Canyon Estates Water Consolidation Project
- Description
- Padre Dam will tap into their existing 16 inch distribution main and install two 11/2 inch water meters to consolidate the existing mobile home park. All trenching and construction will occur in the existing right of way with no disturbance to the natural environment.
2 documents in project