SCH Number 2009082052


Project Info

Title
Antioch Building Materials
Description
NOTE: Approval date for NOD Oct. 5, 2009 & Oct. 13, 2009 The project consists of a General Plan amendment and rezoning in order to make conforming an existing concrete batch plant located at 1375 California Avenue in Pittsburg. The project also includes replacement of various equipment on-site with newer, more efficient and updated equipment on-site with newer, more efficient and updated equipment, in order to enhance the operational efficiency of the facility. Specifically, the proposed site modifications include: Removal of existing ready mix concrete and asphalt plant equipment, to be replaced with modernized equipment to serve the same function (cement and asphalt concrete manufacturing); Installation od two new, 44 ft tall asphalt tanks for storage of material used in the composition of asphalt concrete; Installation of three new, 70 ft tall silos for the short-term (up to 4 days) storage of mixed asphalt concrete; Installation of a 27 ft tall, 57 ft long asphalt plant baghouse, and a 400 sf, unstaffed equipment control room; Other miscellaneous site improvements, including remocal of an existing transformer and new cement concrete pavement at the base of the new asphalt mixing plant equipment and control room.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Pittsburg Antioch Building Materials, General Plan Amendment, Rezoning, Use Permit and Design Review Application No. 08-577
City of Pittsburg Antioch Building Materials