SCH Number 2009081046


Project Info

Title
Recycled Water Pipeline Projects (2007.010 and 2007.120)
Description
NOTE: Review Per Lead The proposed project is the construction of 2 recycled water pipelines. The pipes would be placed underground within existing road right-of-way. Pipeline Component A would consist of ~10,600 linear ft of pipeline connected to the MNWD's existing 650 Zone recycled water system (served by Mathis Operational Tank) to the recylced water system in northern Mission Viejo (served a seasonal storage 920 Zone Upper Oso Reservoir). Pipeline Component A will have an 8 inch diameter and will be installed within the service boundary of MNWD. Pipeline Component B is an estimated 16,100 linear foot pipeline that would begin at the driveway of the J.B. Latham Wastewater Treatment Plant and connect to the existing Golden Lantern Reservoir via Del Obispo Drive, Camino del Avion and Golden Lantern Drive. Pipeline Component B will have a 16 inch diameter and will be installed within the service boundary of neighboring South Coast Water District.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Moulton Niguel Water District (MNWD) Recycled Water Pipeline Projects (2007.010 and 2007.120)
Moulton Niguel Water District (MNWD) Recycled Water Pipeline Projects (2007.010 and 2007.120)