SCH Number 2009081002


Project Info

Title
River Avenue Storm Drain Improvements Project
Description
The proposal involves construction of a parallel storm drain system along River Avenue. The detention basin would temporarily hold 2 acre-feet of storm water during heavy flows and then release the flows as the storm abates. The proposed detention basin would allow the downstream pipe to no longer flow full.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Long Beach River Avenue Storm Drain Improvements Project
City of Long Beach River Avenue Storm Drain Improvements Project