SCH Number 2009081002
Project Info
- Title
- River Avenue Storm Drain Improvements Project
- Description
- The proposal involves construction of a parallel storm drain system along River Avenue. The detention basin would temporarily hold 2 acre-feet of storm water during heavy flows and then release the flows as the storm abates. The proposed detention basin would allow the downstream pipe to no longer flow full.
2 documents in project