SCH Number 2009071026


Project Info

Title
Granite Construction Carroll Sand & Gravel Operator
Description
NOTE: Review Per Lead The operation will produce 1,000,000 tons of material per year and a total of 53 million tons during the life of the project, which is 50 years. Maximum anticipated depth is 120 ft, with an average depth of 100'. The first phase will include the extraction of material from the Carroll Sand and Gravel site and said material will be conveyed to the Granite Jimenez site (immediately north of the Carroll operation) for processing. During the second phase, the processing plant will be removed from the Jimenez site and moved onto the Carroll Site. The processing facility will include an aggregate processing facility consisting of crushers, screen, conveyors, and wash equipment; an asphalt batch plant; a ready mix concrete plant; a concrete and asphalt recycling facility; an office trailer; settling pond; truck scale; and truck equipment parking areas. The applicant proposes to house a 70' silo; however the height limit for the mining area only allows 40'. To remedy the height issue, the applicant applied to the Airport Land Use Commission for a Variance 08-0004 to construct the 70' silo. The project was heard by the Airport Land Use Commission and the Commission found the project consistent with the Airport Land Use Compatibility Plan for the height increase from 40' to 70' for this silo.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Imperial County Granite Construction Carroll Sand & Gravel Operator
Imperial County Granite Construction Carroll Sand & Gravel Operator