SCH Number 2009068228
Project Info
- Title
- Meter Retrofit for the East Walnut Grove Water System
- Description
- The project includes the installation of water meters for 113 residential and 45 commercial properties in the town of East Walnut Grove. The installation will occur within existing utility easements and will require the excavation of a 3'x3'x4'd hole: removal of a section of water pipe; and install new meter with transceiver and accompanying valving at each location. The transceiver will enable the meter to be read via radio drive-by system.
2 documents in project