SCH Number 2009051023
Project Info
- Title
- Delhi Sand Mine and Reclamation Project (CUP 08-015)
- Description
- The Project consists of a surface sand mine that would excavate onsite sand materials and transport them to various offsite locations. The Project would include 2 mining phases. No processing of materials other than possible screening would occur onsite as part of the Project. The Applicant expects that total production would be 500,000 cy of material over a maximum of 5 yrs. This rate of extraction would result in a maximum annual production of 100,000 cy annually. Final reclamation is to cropping, and will be completed within year following the completion of mining and is estimated for mid-2014.
2 documents in project