SCH Number 2009041034


Project Info

Title
Highway 86 Domestic Water Transmission Main Phase 2
Description
The purpose of the Addendum was to review and assess the minor change to the pipeline's southern alignment. The minor change in the project was determined to be consistent with the description of the environmental setting, environmental impacts and mitigation measures as set forth in the certified IS/MND (2012). The Project involves installing, operating and maintaining a 30-inch domestic water transmission pipeline to supply domestic (drinking) water and the construction and operation of a pump station.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Coachella Valley Water District (CVWD) Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station Addendum No. 1 tot he Initial Study/Mitigated Negative Declaration
Coachella Valley Water District (CVWD) Highway 86 Domestic Water Transmission Main Phase 2
Coachella Valley Water District (CVWD) Highway 86 Domestic Water Transmission Main Phase 2