SCH Number 2009032020
Project Info
- Title
- Non-Potable Water System - Phase I
- Description
- The project assessed by this initial study includes the installation of ~12,000 linear ft of 10" to 16" piping, associated valves, fittings, etc. along public rights-of-way and easements along Keystone Pacific Parkway, the Salado Creek Pedestrian Path, American Eagle Avenue, M Street, and N 6th Street, construction of a new non-potable water well to be located at the intersection of Keystone Pacific Parkway and Park Center Drive, and the rehabilitation of an existing well for non-potable uses located at the terminus of North 6th Street, ~1,000 ft north of the intersection with M Street.
2 documents in project