SCH Number 2008092011
Project Info
- Title
- Yahoo! Santa Clara Campus
- Description
- The proposed project is the phased development of a 3,060,000 sf office/research and development campus consisting of 13 six-story buildings, three two-story commons buildings, surface parking lots, two-levels of below grade parking, site circulation and lanscaping following demolition of the existing buildings on the site. The project involves the vacation of Democracy Way, a public street, relocation of existing utilities and installation of new facilities in addition to the dedication of land at the southwest corner of the project site for construction of a City owned and operated 26,000 sf 60/120 kV electric substation. The project includes the use of the Hetch-Hetchy right-of-way for construction staging and project parking. The project also includes the constrction of three new bus duck-outs and bus stops, one on each street frontage of the project site, and construction of a bike lane along the south side of Tasman Drive fronting the project.
3 documents in project