SCH Number 2008082111
Project Info
- Title
- Bear Gulch Creek Bank Stabilization Plan
- Description
- Installation of a crib wall structure along approximately 123 feet of bank, composed of riprap, logs and the planting of vegetation in the interspaces of the crib wall structure and along the bank. A rock weir will be placed in the channel of the creek. The projectproperty is located on the bank of Bear Gulch Creek at 125 Fox Hollow Road in the Town of Woodside, San Mateo County.SAA # 1600-2008-0344-3
3 documents in project