SCH Number 2008062015


Project Info

Title
LM6000 Fleet Upgrade
Description
Note: Notice of Final The project consists of upgrading an existing LM6000 natural gas turbine from the PA model to the PC SPRINT/EFS model in order to increase output by 7.9 megawatts, while reducing the carbon footprint on a per megawatt-hour basis. The upgrade will provide an air quality benefit by reducing nitrogen oxide emissions. The upgrade also improves the cogeneration plant efficiency, resulting in lower consumption of natural gas per megawatt-hour. The upgrade makes changes to the engine, the turbine housing internal package, controls systems, and adds a small water injection skid to improve engine efficiency by increasing the mass flow rate in the turbine.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Central Valley Financing Authority LM6000 Fleet Upgrade
Central Valley Financing Authority LM6000 Fleet Upgrade