SCH Number 2008051113
Project Info
- Title
- Loveland Reservoir Fishing Improvements Project
- Description
- The project includes improvement of approximately 1/2 mile of existing trail segments within the designated fishing area. Existing trails would be widened as needed and unauthorized trails would be closed and allowed to revegetate. Other improvements would include one permanent 16-foot-long pedestrian bridge; a 20-foot-long cable-anchored float crossing to be temporarily secured to metal posts during periods of high water levels; and a 120-foot-long fishing float to provide a stable fishing platform on the north side of the reservoir.
2 documents in project