SCH Number 2008022098


Project Info

Title
Measure A, Interstate 5/80 Interchange Modification
Description
Caltrans and the FHWA, in cooperation with the Sacramento Transportation Authority, propose to improve the operation of the I-5/I-80 interchange with the addition of auxiliary lanes; the elimination of one loop ramp; the addition of a Bus/Carpool flyover; bus/carpool lanes on I-5; and the addition of a mixed flow flyover between I-5 and I-80. The project limits on I-5 acre from the Garden Highway southbound off-ramp to the Arena Boulevard northbound off-ramp (pm 25.2/27.8) and on I-80, from West El Camino Avenue to the Truxel Road eastbound on-ramp (pm 1.3/3.8). The total length of the project is 2.6 miles on I-r and 2.5 miles on I-80.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 3 I-5/I-80 HOV Interchange Modification Project
California Department of Transportation, District 3 I-5/I-80 HOV Interchange Modification Project