SCH Number 2007102051
Project Info
- Title
- Baker Siphon Maintenance Project
- Description
- The purpose of the proposed project is to install an ~850 foot long segment of 42 inch diameter pipeline to replace an existing 36 inch diameter raw water pipeline. A portion of the existing pipeline will be left in place to be used as an emergency overflow, with a blow off valve for maintenance purposes.
2 documents in project