- Edmundson Acres Water Project
- Description
- The project is to install a connection between Edmundson Acres Water System to the Arvin Community Services District by construction of 4,654 feet of new 12-inch transmission line, and 5,997 feet of new 8-inch distribution line. The 12-inch and 8-inch water lines will provide the required flows and pressures to meet domestic and industrial demands together with a fire flow demand of 1,500 gpm. New water services, meters, valves, and eight fire hydrants will also be installed.