SCH Number 2007061062


Project Info

Title
Installation of Line G-3
Description
The City of San Jacinto proposes to implement the construction and installation of a portion of the Line G storm water channel (renamed as part of this project to Line G-3), as shown on the San Jacinto Area Master Drainage Plan. The proposed project will also follow the Jeffery Road Channel alignment identified in the Northwest Improvement Project. The design modifications proposed relate to both plans since each proposed alignment of the channel was to connect directly to what is identified as Line E of the San Jacinto Area Master Drainage Plan or combine with other lines and traverse around the San Jacinto Reservoir. However, Line E, south of the Reservoir has been realigned and constructed to discharge directly into the San Jacinto Reservoir. In order to continue to combine storm water flows for both systems the alignment of Line G-3 will be slightly modified to also discharge directly into the San Jacinto Reservoir, similar to existing Line E. A formal amendment to each plan listed above is not required since the proposed facility is similar to existing plans as related to their location and purpose. The features proposed in this project represent a refinement to their location and purpose. The features proposed in this project represent a refinement to existing plans.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of San Jacinto Installation of Line G-3
City of San Jacinto Modification to Line G-3 of the San Jacinto Drainage Area Master Plan