SCH Number 2007061008
Project Info
- Title
- Hermosa Strand Infiltration Trench, Phase I
- Description
- The project will use native sand filtration to treat discharges of year-round dry weather urban runoff diverted from 10 storm drains that contribute to REC-1 impairment of beaches. Tidal gates installed within the diversion structures will allow for removal of standing water in storm drains that are blocked by sand during dry weather and for thorough cleaning of the storm drains to eliminate conditions which encourage re-growth of bacteria in storm drains and contribute to first flush-related impairment during wet weather.
3 documents in project