SCH Number 2007052025
Project Info
- Title
- Mariposa Lodge Domestic Water, Fire Water, and Leach Field Improvements
- Description
- The proposed project consists of infrastructure improvements at the Mariposa Lodge Alcohol Treatment Facility. These improvements entail the replacement of effluent fitters on the ten existing septic tanks and the expansion of the existing leach fields to the south. New and replacement water, water well, and fire protection piping would be installed to service the facilities with water from a storage tank located east of the property. A total of approx. 2,275 feet of piping would be installed throughout the facility. A future well is also anticipated to be drilled in the proximity of the current storage tank and electrical conduits and a junction box would be installed to power the future well.
2 documents in project