SCH Number 2007032029


Project Info

Title
SacPort Regional Terminal Tankfarm Project
Description
NOTE: Final EIR The Project proposes to relocate the operations of up to four existing petroleum terminals from along the banks of the Sacramento River which are currently operated by Chevron, ConocoPhillips, Shell and BP/Arco. The construction of the proposed SacPort Terminal would include the consolidation of 49 existing petroleum storage tanks to approximately 17 new tanks at the Port of Sacramento site. In addition, the Project proposes to construct a new 1.8 mile pipeline connection to an existing 8-inch Chevron pipeline that currently serves Chevron's Sacramento River terminal. Construction of the new pipeline connection would extend along the south side of the Port Turning Basin and Barge Canal from the west side of the Palamidessi Bridge to just east of Jefferson Boulevard.
Download CSV New Search

 

3 documents in project

Type Lead Agency Received Title
City of West Sacramento SacPort Regional Terminal Tankfarm Project
City of West Sacramento SacPort Regional Terminal Tankfarm Project
City of West Sacramento SacPort Regional Terminal Tankfarm Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.