SCH Number 2007031089


Project Info

Title
Line Section 111 Washout Repairs
Description
CDFG is issuing an Incidental Take Permit to Kinder Morgan Energy Partners, L.P. (KMEP) who is proposing to re-cover two exposed areas (Area 1 and Area 2) of the pipeline and install permanent structures that will protect the pipeline from erosion caused by future storme events. KMEP proposes to install Flexible Concrete Revetments at both washout locations. The proposed FCR structures will either consist of biodegradable bags filled with a sand/cement mix that, when hydrated, becomes solid concrete, or will be installed as an intact solid concrete structure.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert Line Section 111 Washout Repairs
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert Line Section 111 Washout Repairs
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert Line Section 111 Washout Repairs