SCH Number 2007029026


Project Info

Title
Ivy Street Bridge Replacement
Description
The Applicant is proposing to remove the existing two-lane dip-crossing on Ivy Street that crosses Murrieta Creek and replace it with a two-lane, a five-span, cast-in-place bridge structure. Removal of the existing dip-crossing will require the excavation of ~9,800 cy of material, consisting primarily of asphalt. Construction of the bridge will involves the placement of 2,400 cy of riprap, of which 1,900 cy will be placed in upland areas outside of the streambed.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Murrieta Ivy Street Bridge Replacement Project
City of Murrieta Ivy Street Bridge Replacement