SCH Number 2007011127


Project Info

Title
REW 24 Inches Recycled Water Pipeline
Description
The proposed project consists of the construction and operation of a new 24-inch recycled water pipeline to provide the needed capacity and provide redundancy and operational flexibility. The pipeline would consist of ~9,000 feet of 24" diameter steel or ductile iron pipe extending from the existing pipe stub north of Malibu Creek, through Tapia State Park and along Las Virgenes Road north to its intersection with Mulholland Highway. Two additional pipelines may be placed in the trench excavated to install the proposed recycled water pipeline.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Las Virgenes Municipal Water District REW 24 Inches Recycled Water Pipeline
Las Virgenes Municipal Water District REW 24 Inches Recycled Water Pipeline
Las Virgenes Municipal Water District REW 24 Inches Recycled Water Pipeline