SCH Number 2006121007
Project Info
- Title
- Barstow Sanitary Landfill Solid Waste Facility Permit Revision
- Description
- The proposed sliver fill project includes the construction of a toe-berm along the base and edge of the landfill's western slope from a 3:1 to a 2:1 horizontal to vertical ratio thereby extending the total capacity and life of the landfill. The sliver fill method proposed will result in an increase in design capacity from 3,584,500 cubic yards to 4,084,500 cubic yards and result in the site life being increased by approximately one to three years depending on waste inflow rates.
2 documents in project