- Title
- Belltown Market Street Storm Drain, Stage 1 Flood Control Project
- Description
- The proposed project consists of the construction and maintenance of flood control facilities to alleviate flooding in the project area. Drainage facilities will include an 84-inch reinforced concrete pipe (RCP) storm drain within the westerly shoulder of Rubidoux Boulevard, a 78-inch RCP storm drain within the southerly shoulder of 20th Street, a 72-inch RCP storm drain within the westerly shoulder of Avalon Street, 36-inch and 76-inch RCP laterals within Agua Mansa Road, and a 7' x 12' reinforced concrete box storm drain within the easterly shoulder of Market Street. The project will outlet into the Santa Ana River.