- Interstate 5/State Route 52 Maintenance Project
- Description
- Site Development Permit to allow for sewer maintenance activities to clean and televise sewer infrastructure within the Rose Canyon Open Space Park. The project would consist of gaining access to a buried manhole located at a T-section of two perpendicular sewer mains. Access to the manhole would occur through utilization of an existing dirt road/park trail from the intersection of Bothe Avenue and Bloch Street. Construction work would include the extension of the existing access path down an incised bank of Rose Creek; temporarily backfilling a portion of the creek bed to allow for crossing; temporarily installing corrugated steel plates; excavation of the buried manhole and then raising of the manhole approximately 3 feet.