SCH Number 2006052151
Project Info
- Title
- NCRSP Parcel 35 - Galleria Mall Expansion
- Description
- The applicant requests modification of the existing Major Project Permit (Stage 1) and Stage 2 approval of the Major Project Permit (architecture and landscaping) to allow a phased 487,806 (gross) square foot (335,231 leasable) expansion of the existing 1,309,237 square foot (gross) Galleria Mall. Project components include: 1) Expansion of three major tenants (Sears, Macy's, and J.C. Penney) by 40,000 square feet each. 2) Expansion of in-line retail space by 293,617 square feet, including reconfiguration of the outdoor promenade. 3) Two parking structures including one five-level structure, and one "grade plus one" parking deck. The parking decks include a combined addition of 1,760 parking spaces for a total of 6,692. 4) Reconfigured surface parking throughout the site, including 155 additional temporary surface parking spaces near the corner of Galleria Boulevard and Roseville Parkway. 5) Various modifications to the on- and off-site vehicular and pedestrian circulation system to increase efficiency of on-site circulation, including: - Modification and realignment of internal roadways/drive aisles, including internal road widening, - Modifications to existing access driveways from Galleria Boulevard and Roseville Parkway to streamline ingress and egress, including reconfigured or additional egress turn lanes, auxiliary lanes, and additional dual-left turn ingress lanes into the Mall site, - Expansion of the bus transfer station to accommodate an expected increase in public transportation demand as a result of the expansion. 6) Enhancements to the southwest quadrant of the State Route 65 / Galleria Boulevard freeway interchange, including signal optimization, lane reconfiguration, and additional lane storage. 7) Amendment of the existing lease agreement between the City of Roseville and Westfield Shoppingtown LLC. The amended lease agreement will continue the public/private partnership between the City and Westfield and will facilitate the proposed expansion by outlining development obligations, including the public infrastructure necessary to serve the redeveloped property.
3 documents in project