SCH Number 2006041170
Project Info
- Title
- Brand Landfill Stormdrain Re-alignment Project
- Description
- The project involves the installation of a new concrete pipe within the existing access road (northerly side of landfill) for a distance of approximately 1,060 feet. The new concrete pipe is intended to replace the existing pipe that runs underneath the landfill, which was installed in 1965. The existing pipe was damaged as a result of heavy rains that occurred during the 2004-2005 winter season and is not repairable.
2 documents in project