SCH Number 2006041087
Project Info
- Title
- Perris Valley Channel Improvements
- Description
- To ensure the integrity of the HDPE sewer line, EMWD proposes to construct improvements to the levee. Although a final decision has not been made as to the extent of the improvements, there are several options being considered. These include: - Restoring the eroded areas and stabilizing the embankment. - Restoring the eroded areas, stabilizing the embankment, and paving the access road. - Restoring the eroded area, stabilizing the embankment, paving the access road, installing a concrete berm along the access road, and installing down drains to convey runoff to a controlled discharge area.
3 documents in project