SCH Number 2006022116
Project Info
- Title
- Manabe Wetland Restoration Project
- Description
- The Project consists of Phase 2 activities of the Manabe Property Wetland Restoration Project which includes widening the section of the Watsonville Slough channel between Highway 1 and Ohlone Parkway to accommodate additional freshwater marsh and riparian woodland habitat by grading and re-contouring the agricultural row crop land. The main ditch line of Watsonville slough will be widened and the flow will be diverted through gravity culverts or screened pumps and pipes to avoid contact with active grading. Hydroseed will be installed following grading. A trail system would be constructed to provide pedestrian and bicycle access around the perimeter of the site. The trails would be approximately six feet wide and the sides of the trails will be re-vegetated with native vegetation. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2010-0365-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, City of Watsonville.
3 documents in project