SCH Number 2006021042


Project Info

Title
San Bernardino International Airport Authority Aircraft Fuel Farm Project
Description
San Bernardino International Airport Authority has determined that the existing 36,000 gallon fuel storage capacity is not adequate to meet the projected future demand for fuel at the Airport. SBIAA is, therefore, proposing to construct a fuel farm facility near the location of the original Air Force fuel tanks which have been removed. The site was selected because an existing fuel supply pipeline is available at the site. SBIAA anticipates that up to 500,000 gallons of fuel storage capacity will ultimately be needed at the airport. The demand for fuel will increase with growth of air operations, therefore, SBIAA is proposing to construct a fuel farm in increments. The first phase proposes a 150,000 gallong storage capacity with the ability to expand capacity on an as needed basis to about 500,000 gallons.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
San Bernardino International Airport Authority San Bernardino International Airport Authority Aircraft Fuel Farm Project
San Bernardino International Airport Authority San Bernardino International Airport Authority Aircraft Fuel Farm Project