SCH Number 2005091092
Project Info
- Title
- Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation
- Description
- The Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation project consists of the following: - Demolition of existing lift station (including pumps, motors, pipes, appurtenances); - Site improvements (grading, fencing); - Submersible-type pump station (2 pumps, motors, pipes, appurtenances); - 8-foot diameter wet well; - 8 feet high by 480 feet long concrete block wall enclosure; - Emergency generator; - Electrical, instrumentation and control panels; - Metal canopy with structural steel supports; - Approximately 80 feet of 12-inch VCP pipe and 1 manhole; - Approximately 310 feet of 6-inch PVC pipe; - Rehabilitation of approximately 250 feet of 8-inch sewer line; - Renovation of 9 manholes; and - Test, start-up and training for the new lift station facility. Construction of the Bombay Beach Lift Station 51-01 Renovation and Sewer Rehabilitation project is to take about 270 construction days; the targeted completion date is October 2006.
2 documents in project