SCH Number 2005072080
Project Info
- Title
- Rudd Vineyard Conversion Project #04011-ECPA; Levenstein Vineyard Erosion Control Plan
- Description
- The project includes approval of an erosion control plan for earthmoving activity associated with development of a new +/- 2.97 acre vineyard, including installation of erosion control measures as detailed in Erosion Control Plan # 04011-ECPA. Slopes within the project area range from 5% to 19% with an average slope of 17%. The ECPA includes straw mulch, straw bale sediment traps, diversion ditches, waterbars and permanent no-till cover crop with 80% coverage. Grading would consist of land smoothing, ripping and disking. Water would be available from an existing well. A shared easement allows access to the property from Mt. Veeder Road.
2 documents in project