SCH Number 2005072030
Project Info
- Title
- Smith River Left Turn Channelization Safety Project
- Description
- Construct left-turn lanes and shoulder widening beginning at Post Mile (PM) 43.6 to PM 45.9. A continuous two-way left-turn lane and shoulder widening is planned from PM 43.5 to PM 45.3. Shoulder widening will continue from PM 45.3 to PM 45.9 and the addition of a left-turn pocket is currently under consideration at Gilbert Way.
2 documents in project