SCH Number 2005072018


Project Info

Title
Bond Road Widening (Bradshaw Road to Grant Line Road)
Description
This 1.5-mile project would widen Bond Road from the intersection of Bradshaw Road to Grant Line Road from two lanes to four lanes, modification of the existing drainage system within the project area, the installation of a center median along the length of Bond Road, and the installation of two traffic signals at key intersections in the project area. No sidewalk/pathway would be constructed on the north side of Bond Road, and curb or asphalt concrete dike and a shoulder width of 3 to 5 feet would be installed where shallow collection swales are not feasible due to location of existing trees. Curb and gutter, 6-foot shoulder, and a 6-foot sidewalk would be installed on the south side of Bond Road. Roadway safety lighting would be provided at all intersections with Bond Road. on both sides of the roadway. A shoulder width of three feet to five feet would be provided. Roadway safety lighting would be provided at all intersections with Bond Road. The relocation of utilities would be required within the project limits to accommodate the increased width of the roadway.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Elk Grove Bond Road Widening Project from Bradshaw Road to Grant Line Road
City of Elk Grove Bond Road Widening (Bradshaw Road to Grant Line Road)
City of Elk Grove Bond Road Widening Project from Bradshaw Road to Grant Line Road